6.
Output specifications for Waste Minimisation PPP Feasibility Studies
Waste Minimisation Programmes typically include the following outputs:
Preservation of future landfill airspace to avoid massive expenditure forestablishment of new landfill or alternative waste treatment technology as long as possible
Identification and quantification of the core contributors to the waste problem (local Waste Information Data System is required)
Establishment of WM targets and policies that create the right incentives and drivers for WM for all stakeholders
Info/Awareness and Education programs that correspond with the true needs of the community and address the parties that create the main impact (important for both internal and external stakeholders)
Some suggested general and specific ouput specifications for a Waste Minimisation PPP would be to minimise waste through:
• Encouraging the efficient use of materials
• Developing and promoting source reduction and reuse strategies
• Integrating these strategies with recycling
• Reducing the use of nonrecyclable, nonreusable or toxic materials
• Replacing disposable materials and products with recyclables and reusable materials and products
• Reducing volumes of packaging
• Reducing the amount of garden waste landfilled
• Establishing landfill disposal rate structures with incentives to reduce the amount of wastes that generators produce
• Facilitating extended producer responsibility around key problem waste sources
• Increasing the efficiency of the reuse and recycling of paper, cardboard, glass, metal, plastic, and other materials
Sanitary News
http://sanitasinews.blogspot.com
Sumber: Waste Minimisation Section 2.2
0 comments:
Post a Comment